漂亮少妇高潮a片xxxx,色综合AV综合无码综合网站,伊人色综合一区二区三区,国产成人精品热玖玖玖

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
FAQ

Where are you now:Home >> News >> FAQ
What exceptions will occur during SMT production? Normally
Time:2021-10-08 Read: 2869

1. Ideal solder joints

It has good surface wettability, that is, the molten solder should spread on the surface of the welded metal and form a complete, uniform and continuous solder covering layer, and its contact angle should not be greater than 90


The correct amount of solder, the amount of solder is sufficient but not too much or too little

For a good welding surface, the surface of the solder joint should be complete, continuous and smooth, but it does not require a very bright appearance.

Good solder joint position The position deviation of the solder end or pin of the component on the pad is within the specified range.


2. No wetting

The contact angle formed by the solder on the solder joint and the surface of the welded metal is greater than 90


3. Open welding

The pad is separated from the PCB surface after soldering.


4. Suspension bridge (drawbridging)

One end of the component leaves the pad and faces the bag upright diagonally or upright


5. Bridging

The solder between two or more solder joints that should not be connected is connected, or the solder joints of the solder joints are connected with adjacent wires.


6. Welding

After soldering, electrical isolation sometimes occurs between the solder end or the pin and the pad


7. Draw the tip

There are solder burrs protruding outward in the solder joints, but they are not in contact with other conductors or solder joints


8. Solder ball

A small ball of solder that adheres to the printed board, the solder mask or the conductor during soldering.


9. Holes

Holes with different apertures appear in the weld


10. Position offset (skewing)

When the solder joint deviates from the predetermined position in the horizontal, vertical or rotational direction in the plane.


11. Visual inspection

With the aid of a magnifying glass of 2~5 times of the illumination, inspect the quality of PCBA solder joints with naked eyes


12. Inspection after aoldering

Quality inspection after PCB is soldered.


13. Reworking

Repair process to eliminate local defects of surface mount components.


14. Placement inspection

When surface mount components are mounted or after they are mounted, quality inspection is carried out for any missing, misplaced, mis-mounted, damaged, etc. conditions.


In SMT inspection, two methods, visual inspection and optical equipment inspection, are often used. Some only use the visual inspection method, and there are also two mixed methods. They can all inspect the product, but if the visual inspection method is used, people will always get tired, so there is no guarantee that employees will conduct a careful inspection. Therefore, we need to establish a balanced inspection and monitoring (monitering) strategy that is to establish quality process control points.


In order to ensure the normal operation of SMT equipment, strengthen the quality inspection of the processed workpieces in each process, so as to monitor its operating status, and establish quality control points after some key processes. These control points are usually established in the following locations:


1) PCB inspection

a. Whether the printed board is deformed; b. Whether the pad is oxidized; c. Whether the surface of the printed board is scratched;

Inspection method: visual inspection according to inspection standards.


2) Silk screen inspection

a. Is the printing complete; b. Is there any bridging; c. Is the thickness uniform; d. Is there any sag; e. Is there any deviation in the printing;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


3) Patch inspection

a. The placement position of the component; b. Whether there is a chip; c. whether there is a wrong part;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


4) Reflow soldering inspection

a. The soldering condition of the component, whether there are bad soldering phenomena such as bridging, tombstones, dislocation, solder balls, virtual soldering, etc. b. Soldering joints.

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: www.nhjiashun.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號(hào)
  • Links:
久久精品国产亚洲AV麻豆| 亚洲欧洲自拍偷拍一区二区| 亚洲日韩国产欧美久久久| 亚洲av人人澡人人爽人人夜夜| 永久免费a∨片在线观看| 一本大道伊人av久久综合| 午夜时刻免费入口| 国内精品熟女亚洲精品熟女| 国产成人污污网在线观看 | 花火视频影视大全免费观看| 国产精品久久久一区无码| 国产麻豆剧果冻传媒白晶晶| 欧美 日韩 在线 播放| 国产日产久久高清欧美一区WW| 人妻借种太粗进不去| 美女裸体a级毛片| 久久精品国产99国产精品| 日韩人妻无码精品一区二区三区| 成人av无码一区二区三区| 免费少妇a级毛片| 亚洲熟妇无码另类久久久| 日韩中文一区二区三区精品| 久久无码电影免费黄网站| 欧美精品亚洲精品日韩专区| 亚洲激情第一页在线观看| 久久人人爽人人爽人人片av麻烦| 免费在线看A级片儿视频| 公交车被cao得合不拢腿视频| 成人影院无码专区线路一| 亚洲色大成网站www私| free性丰满hd性欧美| 亚洲熟女精品一区二区视频| 欧美精品一区二区三区精品| 2022亚洲国产精品自拍| 少妇多水xxxx色情免费| 日本无码黄动漫在线观看| 亚洲av夜夜欢一区二区三区| 久久人午夜亚洲精品无码区| 嫩模被强到高潮呻吟不断| 亚洲人色婷婷成人网站在线观看 | 亚洲国产综合精品2020|